New RFQ
What you are asking for
For Job (leave blank for stock)
Stock, not on a Job
Job 10431, CH1 C2 contactor and overload replacement
Job 10432, Replace suction butterfly valve
Job 10433, Heat pump compressor
Job 10434, Leak repairs, CHW riser L4 to L9
Job 10435, CHW pump
Job 10436, Emergency lighting audit and repairs
Job 10437, Switchboard thermal imaging and tightening
Job 10438, Level 3 fit-out power and data
Job 10439, Fire indicator panel upgrade
Job 10440, Quarterly sprinkler flow test
Job 10443, Exhaust fan VSD retrofit
Job 10444, Cooling tower strainer clean and service
Job 10445, VRF outdoor unit fan motor
Job 10446, Chiller 2 compressor oil analysis and top-up
Job 10447, Warehouse high-bay LED upgrade
Job 10448, RCD testing, all tenancies
Job 10449, Main switchboard isolator replacement
Job 10450, Fire pump annual service and churn test
Job 10451, Hydrant booster valve replacement
Job 10453, BMS controller replacement, AHU 6 to 9
Job 10454, Generator load bank test
Job 10456, Mechanical services, Levels 3 to 8 fit-out
Job 10457, Electrical services, Stage 2 warehouse
Job 10458, Fire services, Block D science building
Job 10460, Package unit replacement, Level 2 tenancy
Job 10465, Quarterly emergency lighting test, Block B
Job 10466, Kitchen exhaust fan noise call-out
Job 10467, Six-monthly sprinkler valve inspection
Quotes wanted by
Item
Qty
Remove
Choose an item
Split system, 7.1 kW inverter, wall hung (SPL-7KW, ea)
Split system, 2.5 kW inverter, wall hung (SPL-25KW, ea)
Pair coil 1/4 x 3/8, insulated (PC-1438, m)
Pair coil 3/8 x 5/8, insulated (PC-3858, m)
Wall bracket, outdoor unit, galvanised (BRKT-WALL, ea)
Condensate drain, 25 mm PVC (CDT-25, m)
Isolator, 20 A weatherproof (ISO-20A, ea)
TPS cable 2.5 mm 2 core and earth (TPS-25, m)
Refrigerant R32, 9 kg cylinder (R32-9, ea)
Refrigerant R410A, 11.3 kg cylinder (R410-11, ea)
Contactor, 3 pole 65 A (CON-65, ea)
Butterfly valve, DN150 wafer, gear operated (VLV-BFV150, ea)
Filter, G4 panel 595 x 595 x 47 (FLT-G4, ea)
Filter, F7 bag 592 x 592 (FLT-F7, ea)
Pipe lagging 25 mm, with cladding (LAG-25, m)
Valve actuator, 24 V modulating (ACT-24V, ea)
LED high-bay 150 W (LED-HB150, ea)
Circuit breaker, 3 pole 100 A (MCB-3P100, ea)
Photoelectric smoke detector head (SMK-PE, ea)
Sprinkler head, pendant 68 °C (SPR-68, ea)
Crane hire, 25 t with operator (CRANE-HR, hr)
Package unit compressor, 10 kW (PKG-COMP, ea)
Isolation valve set, DN25 (ISO-VLV, ea)
VSD kit, 11 kW (PKG-VSD, ea)
Controller and sensor kit (PKG-CTRL, ea)
Freight and handling (FRT, ea)
Heat pump scroll compressor, 15 kW (HP-COMP, ea)
CHW pump, end suction 11 kW (PUMP-CHW11, ea)
BMS controller, 24 point (BMS-CTRL, ea)
Mechanical seal kit, CHW pump (SEAL-KIT, ea)
Emergency light fitting, 3 hr battery (EMG-LIGHT, ea)
Fan motor, VRF outdoor unit 750 W (FAN-MTR, ea)
Compressor oil, POE 5 L (OIL-POE, ea)
Main isolator, 400 A (ISO-400, ea)
Fire pump seal and coupling set (PUMP-SEAL, ea)
Hydrant booster valve, 100 mm (HYD-VLV, ea)
VAV box, 600 x 300 with controller (VAV-BOX, ea)
AHU, 8,000 L/s, with controls (AHU-8K, ea)
Chilled water pipework package, Levels 3 to 8 (CHW-PIPE, lot)
Pipework refurbishment package, Levels 1 to 4 (PIPE-REFURB, lot)
Cable and tray package, Stage 2 (CABLE-PKG, lot)
Sprinkler pipework package, Block D (FIRE-PIPE, lot)
VSD, 15 kW, IP55 (VSD-15, ea)
Cable tray installation, per metre (TRAY-INST, m)
Electrician, normal time (contractor) (LAB-ELEC-C, hr)
HVAC Tech, normal time (contractor) (LAB-HVAC-C, hr)
Fire Tech, normal time (contractor) (LAB-FIRE-C, hr)
Add item
Send to
Actrol
Supplier
Reece HVAC
Supplier
Tradelink
Supplier
MMEM
Supplier
Airepure
Supplier
Belimo
Supplier
Fire Pro Supplies
Supplier
Coastline Cranes
Supplier
Brightline Electrical
Contractor
Apex Refrigeration
Contractor
Firewatch Testing
Contractor
Coral Coast Mechanical
Contractor
Sparkline Electrical
Contractor, insurance expired
Harbour City Electrical
Contractor
Save as Draft
Send to recipients
Replies land on the RFQ as they come back, and the comparison fills in.