Project P-102
ActiveBrightwater Logistics Hub, Stage 2
Brightwater BuildersBrightwater Logistics Hub, Stage 2, 14 Industry Dr, Eagle Farm QLD 4009
- Contract
- BB-2026-118
- Started
- 03/06/2026
| Job | Type | Status | Due | Documents | RFIs |
|---|---|---|---|---|---|
| 10457Electrical services, Stage 2 warehouse | Electrical | In progress | 11/12/2026 | 10, 1 Drawing in use at a superseded revision | 31 unanswered, 1 overdue |
| 10447Warehouse high-bay LED upgrade | Electrical | In progress | 06/11/2026 | 2 | 10 unanswered |
| 10451Hydrant booster valve replacement | Fire | Unscheduled | 15/11/2026 | 1 | 0 |
Documents and RFIs held on each Job are counted on that Job. The Project's own are on the tabs above.
- Client
- Brightwater Builders
- Site
- Brightwater Logistics Hub, Stage 2, 14 Industry Dr, Eagle Farm QLD 4009
- Contract reference
- BB-2026-118
- Started
- 03/06/2026
- Jobs
- 3 Jobs