Average days to answer
4.1 days
Raised to answered, across answered RFIs
| RFI | Held on | Raised by | To | Raised | Due | Answered | Days open | Status |
|---|---|---|---|---|---|---|---|---|
| Re F-201: Confirm the shutdown date for tying the new fire panel into the Block D supply. | Project P-103Tallowood College, Block D science building | Kate Lindqvist | Hamish GreerFacilities manager | 09/10/2026 | 16/10/202615 days overdue | - | 22 | Overdue |
| Re A-201: Level 6 ceiling layout moved after the last issue. Confirm the current reflected ceiling plan is Rev D. | Project P-101Westmoor Tower, Levels 3 to 8 fit-out | Kate Lindqvist | Costa VargaSite manager | 20/10/2026 | 27/10/20264 days overdue | - | 11 | Overdue |
Showing 1 to 2 of 2 RFIs