RFIHeld onRaised byToRaisedDueAnsweredDays openStatus
Re F-201: Confirm the shutdown date for tying the new fire panel into the Block D supply.Project P-103Tallowood College, Block D science buildingKate LindqvistHamish GreerFacilities manager09/10/202616/10/202615 days overdue-22Overdue
Re A-201: Level 6 ceiling layout moved after the last issue. Confirm the current reflected ceiling plan is Rev D.Project P-101Westmoor Tower, Levels 3 to 8 fit-outKate LindqvistCosta VargaSite manager20/10/202627/10/20264 days overdue-11Overdue
Confirm the Stage 2 practical completion date and the access date for electrical fit-off.Project P-102Brightwater Logistics Hub, Stage 2Sam OkaforHolly BrennanSite manager25/10/202601/11/2026-6Open
Confirm the date and street permit for the crane lift of the Level 2 condenser.Project P-105Ironbark Offices, Level 2 tenancyKate LindqvistPia LindgrenSite manager26/10/202602/11/2026-5Open
Core drilling for the risers needs after-hours work. Confirm the permitted hours and the notice period.Project P-101Westmoor Tower, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager29/10/202605/11/2026-2Open