RFIHeld onRaised byToRaisedDueAnsweredDays openStatus
Re F-201: Confirm the shutdown date for tying the new fire panel into the Block D supply.Project P-103Tallowood College, Block D science buildingKate LindqvistHamish GreerFacilities manager09/10/202616/10/202615 days overdue-22Overdue
Re F-201: A mezzanine was added over the Block D lab prep room. Confirm whether it needs its own coverage or is covered from below.Job 10458Fire services, Block D science buildingKate LindqvistHamish GreerFacilities manager13/10/202620/10/202611 days overdue-18Overdue
Re E-202: Bays 3 and 4 have a lower roof truss line. Confirm the mounting height for the high-bay fittings against the lighting layout.Job 10457Electrical services, Stage 2 warehouseKate LindqvistSam TeasdaleConstruction manager19/10/202626/10/20265 days overdue-12Overdue
Re A-201: Level 6 ceiling layout moved after the last issue. Confirm the current reflected ceiling plan is Rev D.Project P-101Westmoor Tower, Levels 3 to 8 fit-outKate LindqvistCosta VargaSite manager20/10/202627/10/20264 days overdue-11Overdue
The CHW riser from Level 7 to 9 is only reachable after hours. Confirm the access arrangement.Job 10434Leak repairs, CHW riser L4 to L9Priya NairErin CallowayBuilding manager23/10/202628/10/20263 days overdue-8Overdue
The isolator replacement needs a full-site shutdown. Which weekend suits?Job 10449Main switchboard isolator replacementSam OkaforDaniel FerreiraBuilding manager21/10/202628/10/20263 days overdue-10Overdue
Confirm spare capacity at the Level 13 distribution board for the new amenities load.Tender T-2124Westmoor Tower Level 13 amenities, electricalSam OkaforAngela PapadakisProject manager21/10/202628/10/20263 days overdue-10Overdue
Re M-401: The controls schematic puts the BMS controller in the Level 7 comms room. The comms room is fully allocated. Where does the controller go?Job 10456Mechanical services, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager22/10/202629/10/20262 days overdue-9Overdue
The BMS points list appears in the specification but not on the drawings. Confirm whether BMS controls are in our package.Tender T-2128Southbank Arcade Level 2 conversion, mechanicalRob HendryTess MoriartyAsset manager26/10/202630/10/20261 day overdue-5Overdue

Showing 1 to 9 of 9 RFIs