Documents
Across Jobs, Projects and Tenders
Drawings
106 earlier revisions kept as superseded
| Document | Type | Revision | Held on | Updated | Size | Source |
|---|---|---|---|---|---|---|
| Photo | - | Job 10431CH1 C2 contactor and overload replacement | 30/10/2026 | 2.0 MB | Priya Nair | |
| Photo | - | Job 10432Replace suction butterfly valve | 30/10/2026 | 2.0 MB | Priya Nair | |
| Photo | - | Job 10434Leak repairs, CHW riser L4 to L9 | 30/10/2026 | 2.0 MB | Priya Nair | |
| Photo | - | Job 10436Emergency lighting audit and repairs | 30/10/2026 | 2.0 MB | Jack O'Connell | |
| Photo | - | Job 10437Switchboard thermal imaging and tightening | 30/10/2026 | 1.9 MB | Aaliyah Hughes | |
| Drawing | Rev B1 earlier | Job 10446Chiller 2 compressor oil analysis and top-up | 30/10/2026 | 1.4 MB | Rob Hendry | |
| Photo | - | Job 10447Warehouse high-bay LED upgrade | 30/10/2026 | 1.9 MB | Sienna Walsh | |
| Photo | - | Job 10451Hydrant booster valve replacement | 30/10/2026 | 1.9 MB | Sam Okafor | |
| Photo | - | Job 10467Six-monthly sprinkler valve inspection | 30/10/2026 | 1.9 MB | Rob Hendry | |
| Photo | - | Job 10433Heat pump compressor | 29/10/2026 | 1.9 MB | Liam Cartwright | |
| Photo | - | Job 10443Exhaust fan VSD retrofit | 29/10/2026 | 1.9 MB | Priya Nair | |
| Photo | - | Job 10453BMS controller replacement, AHU 6 to 9 | 29/10/2026 | 1.9 MB | Kate Lindqvist | |
| Photo | - | Job 10438Level 3 fit-out power and data | 28/10/2026 | 1.9 MB | Aaliyah Hughes | |
| Photo | - | Job 10439Fire indicator panel upgrade | 28/10/2026 | 1.9 MB | Mia Tran | |
| Photo | - | Job 10449Main switchboard isolator replacement | 28/10/2026 | 1.9 MB | Rob Hendry | |
| Drawing | Rev A | Job 10443Exhaust fan VSD retrofit | 26/10/2026 | 1.4 MB | Rob Hendry | |
| Specification | - | Job 10432Replace suction butterfly valve | 25/10/2026 | 252 KB | Kate Lindqvist | |
| Drawing | Rev A | Job 10449Main switchboard isolator replacement | 25/10/2026 | 1.4 MB | Rob Hendry | |
| Photo | - | Job 10431CH1 C2 contactor and overload replacement | 24/10/2026 | 1.9 MB | Liam Cartwright | |
| Drawing | Rev B1 earlier | Job 10434Leak repairs, CHW riser L4 to L9 | 24/10/2026 | 1.4 MB | Rob Hendry | |
| Photo | - | Job 10432Replace suction butterfly valve | 23/10/2026 | 1.9 MB | Priya Nair | |
| Photo | - | Job 10447Warehouse high-bay LED upgrade | 23/10/2026 | 1.9 MB | Sienna Walsh | |
| Photo | - | Job 10444Cooling tower strainer clean and service | 22/10/2026 | 1.9 MB | Tom Fraser | |
| Drawing | Rev A | Job 10431CH1 C2 contactor and overload replacement | 21/10/2026 | 1.4 MB | Rob Hendry | |
| Photo | - | Job 10434Leak repairs, CHW riser L4 to L9 | 21/10/2026 | 1.9 MB | Liam Cartwright |
Showing 1 to 25 of 119 Documents