RFIHeld onRaised byToRaisedDueAnsweredDays openStatus
Re F-201: Confirm the shutdown date for tying the new fire panel into the Block D supply.Project P-103Tallowood College, Block D science buildingKate LindqvistHamish GreerFacilities manager09/10/202616/10/202615 days overdue-22Overdue
Re A-201: Level 6 ceiling layout moved after the last issue. Confirm the current reflected ceiling plan is Rev D.Project P-101Westmoor Tower, Levels 3 to 8 fit-outKate LindqvistCosta VargaSite manager20/10/202627/10/20264 days overdue-11Overdue
Confirm the Stage 2 practical completion date and the access date for electrical fit-off.Project P-102Brightwater Logistics Hub, Stage 2Sam OkaforHolly BrennanSite manager25/10/202601/11/2026-6Open
Confirm the date and street permit for the crane lift of the Level 2 condenser.Project P-105Ironbark Offices, Level 2 tenancyKate LindqvistPia LindgrenSite manager26/10/202602/11/2026-5Open
Core drilling for the risers needs after-hours work. Confirm the permitted hours and the notice period.Project P-101Westmoor Tower, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager29/10/202605/11/2026-2Open
Confirm approved slab penetration locations on Level 3 for the new risers.Answer: Approved at gridlines B/4 and D/4.Project P-104Parkside Commerce Centre, Levels 1 to 4 refurbishmentRob HendryNadia KowalczykDevelopment manager03/06/202610/06/202607/06/20264Answered
Confirm the date for the practical completion inspection and who attends for the mechanical works.Answer: Booked for the following Tuesday. Attend with the commissioning engineer.Project P-104Parkside Commerce Centre, Levels 1 to 4 refurbishmentKate LindqvistNadia KowalczykDevelopment manager01/09/202608/09/202604/09/20263Answered
Confirm whether the Level 1 laboratories are classified as containment areas for the detection design.Answer: Not containment. Standard detection applies.Project P-103Tallowood College, Block D science buildingSam OkaforRuby OkoroGrounds and maintenance lead11/09/202618/09/202616/09/20265Answered
Confirm the finished ceiling height over the Level 8 plant deck so the supply ductwork can be coordinated.Answer: 2700 mm AFFL.Project P-101Westmoor Tower, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager25/09/202602/10/202630/09/20265Answered
Re A-401: Confirm the mezzanine floor load rating for the Stage 2 racking and the electrical plant above.Answer: 5 kPa distributed. Plant above to be on its own plinths.Project P-102Brightwater Logistics Hub, Stage 2Sam OkaforSam TeasdaleConstruction manager28/09/202605/10/202603/10/20265Answered

Showing 1 to 10 of 10 RFIs