RFIHeld onRaised byToRaisedDueAnsweredDays openStatus
Re F-201: Confirm the shutdown date for tying the new fire panel into the Block D supply.Project P-103Tallowood College, Block D science buildingKate LindqvistHamish GreerFacilities manager09/10/202616/10/202615 days overdue-22Overdue
Re F-201: A mezzanine was added over the Block D lab prep room. Confirm whether it needs its own coverage or is covered from below.Job 10458Fire services, Block D science buildingKate LindqvistHamish GreerFacilities manager13/10/202620/10/202611 days overdue-18Overdue
Re E-202: Bays 3 and 4 have a lower roof truss line. Confirm the mounting height for the high-bay fittings against the lighting layout.Job 10457Electrical services, Stage 2 warehouseKate LindqvistSam TeasdaleConstruction manager19/10/202626/10/20265 days overdue-12Overdue
Re A-201: Level 6 ceiling layout moved after the last issue. Confirm the current reflected ceiling plan is Rev D.Project P-101Westmoor Tower, Levels 3 to 8 fit-outKate LindqvistCosta VargaSite manager20/10/202627/10/20264 days overdue-11Overdue
The CHW riser from Level 7 to 9 is only reachable after hours. Confirm the access arrangement.Job 10434Leak repairs, CHW riser L4 to L9Priya NairErin CallowayBuilding manager23/10/202628/10/20263 days overdue-8Overdue
The isolator replacement needs a full-site shutdown. Which weekend suits?Job 10449Main switchboard isolator replacementSam OkaforDaniel FerreiraBuilding manager21/10/202628/10/20263 days overdue-10Overdue
Confirm spare capacity at the Level 13 distribution board for the new amenities load.Tender T-2124Westmoor Tower Level 13 amenities, electricalSam OkaforAngela PapadakisProject manager21/10/202628/10/20263 days overdue-10Overdue
Re M-401: The controls schematic puts the BMS controller in the Level 7 comms room. The comms room is fully allocated. Where does the controller go?Job 10456Mechanical services, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager22/10/202629/10/20262 days overdue-9Overdue
The BMS points list appears in the specification but not on the drawings. Confirm whether BMS controls are in our package.Tender T-2128Southbank Arcade Level 2 conversion, mechanicalRob HendryTess MoriartyAsset manager26/10/202630/10/20261 day overdue-5Overdue
Chiller 1 needs a four-hour isolation to swap the contactor. Which window suits the facility?Job 10431CH1 C2 contactor and overload replacementLiam CartwrightDean WhitlockFacilities manager28/10/202631/10/2026-3Open
Confirm the Stage 2 practical completion date and the access date for electrical fit-off.Project P-102Brightwater Logistics Hub, Stage 2Sam OkaforHolly BrennanSite manager25/10/202601/11/2026-6Open
Confirm the date and street permit for the crane lift of the Level 2 condenser.Project P-105Ironbark Offices, Level 2 tenancyKate LindqvistPia LindgrenSite manager26/10/202602/11/2026-5Open
Confirm the BMS network firmware version before the controllers are ordered.Job 10453BMS controller replacement, AHU 6 to 9Rob HendryNadia KowalczykDevelopment manager27/10/202603/11/2026-4Open
Re M-202: Confirm the fire damper positions where ductwork crosses the Level 4 service shaft wall, against the fire engineer's markup.Job 10456Mechanical services, Levels 3 to 8 fit-outSam OkaforCosta VargaSite manager28/10/202604/11/2026-3Open
Re M-301: The terrace plan shows the condenser against the parapet. Confirm the clearance to the parapet and the plant screen.Job 10460Package unit replacement, Level 2 tenancyKate LindqvistPia LindgrenSite manager29/10/202605/11/2026-2Open
Core drilling for the risers needs after-hours work. Confirm the permitted hours and the notice period.Project P-101Westmoor Tower, Levels 3 to 8 fit-outRob HendryAngela PapadakisProject manager29/10/202605/11/2026-2Open
Re M-101: The plant room moved to the roof. Does the builder provide the crane and the lift permit?Tender T-2128Southbank Arcade Level 2 conversion, mechanicalRob HendryTess MoriartyAsset manager29/10/202605/11/2026-2Open
The reissued fire engineering report moves the smoke zone boundaries. Confirm the zones the detection layout should follow.Tender T-2131Tallowood College Block G refurbishment, fireKate LindqvistHamish GreerFacilities manager30/10/202606/11/2026-1Open
The landlord has an approved VAV box list. Confirm we price from it.Tender T-2133Parkside Commerce Centre Level 9 fit-out, mechanicalRob HendryNadia KowalczykDevelopment manager31/10/202607/11/2026-0Open

Showing 1 to 19 of 19 RFIs